96. Which of the following is true about rolling wave planning?
  1. It allows you to plan to the lowest detail in advance.
  2. It plans for the work only after key people are in place
  3. Involves waiting until additional information is available before planning
  4. Work packages are determined at each level early on in the project
  5. It is not an acceptable project management technique
97. Once the Project Manager completes the schedule network analysis, the risk that is identified must be cared for within the project schedule. What type of formats are permissible ways to show logical relationships?
  1. Network Diagram
  2. Project Scope Statement
  3. Progress Reports
  4. Critical Path Baseline
  5. PERT
98. When is the project manager using analogous estimating?
  1. The PM doesn’t have all of the information needed to give time estimates
  2. The PM needs to pad their estimates
  3. The PM is using a mathematical model
  4. The PM uses similar projects or activities to assist with time estimates
  5. The PM is using a Monte Carlo technique
99. When is the project manager using parametric estimation?
  1. If the Project Manager is using his instinct to determine the estimated project length
  2. If the Project Manager needs to pad their estimates
  3. If the Project Manager is using Monte Carlo analysis
  4. Using a statistical relationship that exists through historical data or other mathematical relationship
  5. None of the above
100. Which of the following is common problem in project management that is a typical result of unrealistic time estimates by the project manager?
  1. Fast tracking
  2. Critical chain
  3. Schedule compression
  4. Employee changes
  5. Crashing