In a sustainable purchasing policy, all of the following may be found on the checklist except:
  1. use locally manufactured materials
  2. use >80% recycled content
  3. low or no-VOC
  4. discard excess material waste after use
Explanation
Answer: D - Discard excess material waste after use is not considered a sustainable strategy in the purchasing policy. After use, material waste shall be recycled or disposed of properly through the available channels offered by the state or local city jurisdictions. All attempts should be made to recycle or reuse as much of the excess and waste materials as possible.