Feasibility studies and engineering surveys are most necessary prior to which of the following new offerings?
  1. general obligation bonds
  2. limited tax bonds
  3. revenue bonds
  4. corporate debentures
Explanation
Answer: C - revenue bonds. The security for a revenue bond depends on the revenue produced by the specific facility. Engineering estimates of constructions costs and potential traffic flow are critical.