CompTIA Server+ - Question List

Select how would you like to study

66. John is an Administrator in charge of the power backup unit in his organization. The server uses a 350 Watt monitor, 50 Watt speaker, and a 500 Watt power supply. What is the minimum possible VA rating of the UPS that must be able to handle the server?
  1. 1500 VA
  2. 2000 VA
  3. 3000 VA
  4. 1800 VA
67. Which of the following hard drive specifications supports data transfer rates of up to 150 MBps?
  1. Ultra-ATA
  2. Serial ATA
  3. Fast SCSI
  4. ATA
68. Which of the following RAID implementation types features disk striping and a dedicated parity drive?
  1. RAID-0
  2. RAID-1
  3. RAID-3
  4. RAID-5
69. You want to change the role of a server from a file server to a database server. The server hardware includes 2 GB RAM, 500 MHz CPU, 10/100 Ethernet NIC, and a Hardware RAID subsystem. Which of the following components may not be optimal if this server is used as a database server?
  1. RAM
  2. NIC
  3. RAID
  4. Processor
70. You have just upgraded the processor on your computer. Now, the computer does not finish the POST. Which of the following may be the most likely cause of this?
  1. BIOS is not flashed.
  2. Processor is not seated properly.
  3. Incorrect jumper settings on the processor.
  4. The new cache size on the processor is too low.

Select how would you like to study