31.
Upon completion of a new panelboard installation in a single dwelling, which of the following is required?
  1. At least four open spaces in any configuration.
  2. At least six open spaces in any configuration.
  3. At least four open spaces with at least one space available for a two-pole breaker.
  4. At least two open spaces with at least one space available for a two-pole breaker.
32.
Which of the following is not considered an overcurrent device?
  1. The overload heaters of a motor starter.
  2. Time-delay fuses.
  3. A GFCI breaker.
  4. A magnetic trip breaker.
33.
12 AWG copper wire has been used to wire a NEMA 14-30R receptacle. What is the maximum size of breaker permitted for the circuit?
  1. 15 A
  2. 20 A
  3. 30 A
  4. 50 A
34.
The calculated load of a service feeder has been calculated at 125 A and will be wired with a #1 AWG copper conductor at 75 degrees termination temperature. What is the maximum rating of overcurrent device permitted?
  1. 100 A
  2. 125 A
  3. 150 A
  4. 200 A
35.
Which of the following is not required to be provided by your employer?
  1. SDS sheets for any hazardous chemicals present.
  2. Task-specific PPE.
  3. Replacement tools.
  4. Safety training courses.

Select how would you like to study