FE Civil Engineering Exam Prep

Category - Civil Engineering

Which of the following is a potential safety or operational issue associated with a bridge spanning a recently repaved roadway that now has a vertical clearance of 4-inches less than posted?
  1. Collisions with bridge structure
  2. Multiple vehicle crashes
  3. Traffic delays
  4. All of the above
Explanation
Answer: D - Potential safety and/or operational issues associated with a bridge spanning a recently repaved roadway that now a vertical clearance of 4-inches less than posted includes all of the listed issues. Drivers of large vehicles depend on the posted clearance values to avoid collisions with the bridge structure. Collisions with overhead structures often lead to multiple crashes due to limitations on stopping site distances, design speeds, and traffic conditions. Traffic delays may result from overhead structure collisions, multiple vehicle crashes and repairs to the damaged structure.
Was this helpful? Upvote!
Login to contribute your own answer or details

Top questions

Related questions

Most popular on PracticeQuiz