Engineering changes and capabilities may be required in lean or Six Sigma methodologies. Engineering changes are most commonly needed in which of the following?
  1. PDSA changes.
  2. Kaizen blitz events.
  3. DMADV methodology.
  4. Poke yoke implementation.
Explanation
Answer: C - DMADV methodology most commonly requires engineering changes, as the methodology is used for new products or services requiring design and product verification. The capabilities must be engineered into the new design or prototype.